+(86)025-5730 2003
企业新闻 发布时间:2026-02-02 发布作者:拓弥自动化

Vacuum tube lifting machine TD operation instructions

- It is designed for two hand operation, to control rising & dropping

- Venting valve is integrated inside, the vacuum can be released very fast

- It is designed base on Ergonomic Principles, & easy to operate

Manual operation control instructionsControl the lifting handle to control the size of the vacuum valve openingand realize the vacuum tube up or down

  • Balancing without load valve:Clockwise rotation control valve, the vacuum tube up ;Counterclockwise rotation control valve, the tube down;Confirm the height and ensure that the operator operates at a comfortable height. Every time the power is turned on in the future, the lifting tube will automatically rise to this height 
  • Balancing with load valve:Clockwise rotation control valve, the vacuum tube up ;Counterclockwise rotation control valve, the tube down;Confirm the height and ensure that the operator operates at a comfortable height. Every time the power is turned on in the future, the lifting tube will automatically rise to this height
  • Control up:Grasp the left handle with your left hand,pull up the control handle with your right hand,the lifting control handle is fast, and the lifting  of the vacuum tube is fast, otherwise it will be slow
  • Control down:Grasp the left handle with your left hand,press down the control handle with your right hand,the pressing control handle is fast, and the falling  of the vacuum tube is fast, otherwise it will be slow. When the workpiece descends to the contact surface, press down the quick release valev- release the workpiece